Home 
Profile
Service
       Termite Control
       Pest Control
       Rodent Control  
Contact
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

As many are aware of Termites or white ants which cause extensive damage to wood and wooden structures and are a major threat to wood and buildings.

We eradicate termites by using government approved chemicals and tested chemicals to eradicate and flush out the termites.

For termite control we have 


1. Post construction termite control treatment
2. pre construction termite control treatment



1. Post construction termite control treatment

As the name implies post construction termite control is initiating
termite control measures after the building or the house is constructed

we undertake this work in the following steps

1. we drill around all the windows and door frames at the frame wall junctions
at nine inches intervals
and inject the chemical using a pressure pump the chemical thus injected
plunges and gets absorbed by the wood and the wall area thus creating a
chemical barrier for the termites the drilled holes are sealed after the
above operation by means of white cement.

2. we drill along side the floor and wall junctions at two feet intervals
and inject the chemical using a pressure pump the chemical thus injected
plunges and gets absorbed by the wood and the wall area thus creating a
chemical barrier for the termites the drilled holes are sealed after the
above operation by means of white cement.

3. we drill or dig holes at the outside of the premises surrounding the
premises at two feet intervals and inject the termicide and close the
holes.

4. we spray the chemical in all the Switch boxes after removing the front
covers and also on all the almirahs, racks lofts .



2. PRECONSTRUCTION TERMITE CONTROL TREATMENT

As the name suggests PRE-CONSTRUCTION TERMITE CONTROL TREATMENT is termite control at stages during the building construction process this kind of treatment has the following important stages.

1. Spraying the termicide on all wall surfaces and bottom surface
of the foundation column pits.

2. spraying the termicide before the flooring concrete but after the
consolidation is over by digging holes at two feet intervals along
the beams and pouring the termicide.

3. spraying the termicide in the ground before the mosaic after the
leveling for the mosaic is over.

4. spraying the termicide in the wooden door and window frames and
also on the to be fixed areas.

5. spraying the termicide in the TW switch boards.